This building constituted as a PPE is spread over 4 attic levels. It is composed of 6 apartments located in the heart of St-Gingolph and has a total gross surface area of approximately 421 m2. It is located on a plot of 191 m2.
It is distributed as follows:
- Semi-buried basement serving as cellars, wine cellar, technical room and shared laundry room
- Ground floor: Apartment No. 1 with 4 rooms
- 1st floor: Apartment No. 2 with 2 rooms / Apartment No. 3 with 3 rooms / Studio apartment No. 4. Balcony
- 2nd floor: Apartment No. 5 with 2 rooms / Apartment No. 6 with 4.5 rooms (currently still rented). Balcony
- Uninhabitable attic space currently used as attic storage
The plot is located in the center of the village in the Village V building zone, next to the municipal road Route de Gouillon. Close to the CFF train station. View of the lake.
No outdoor or indoor parking space. However, zone A macaron spaces are available in the immediate vicinity of the building, very advantageous rates.
Built in 1919 but since then several transformation, maintenance and renovation interventions have been carried out.
Boiler room renovation in 2013, partial replacement of windows in 2018, complete renovation of the framework and roof in 2004. Regular standard maintenance.
It is distributed as follows:
- Semi-buried basement serving as cellars, wine cellar, technical room and shared laundry room
- Ground floor: Apartment No. 1 with 4 rooms
- 1st floor: Apartment No. 2 with 2 rooms / Apartment No. 3 with 3 rooms / Studio apartment No. 4. Balcony
- 2nd floor: Apartment No. 5 with 2 rooms / Apartment No. 6 with 4.5 rooms (currently still rented). Balcony
- Uninhabitable attic space currently used as attic storage
The plot is located in the center of the village in the Village V building zone, next to the municipal road Route de Gouillon. Close to the CFF train station. View of the lake.
No outdoor or indoor parking space. However, zone A macaron spaces are available in the immediate vicinity of the building, very advantageous rates.
Built in 1919 but since then several transformation, maintenance and renovation interventions have been carried out.
Boiler room renovation in 2013, partial replacement of windows in 2018, complete renovation of the framework and roof in 2004. Regular standard maintenance.