New contemporary freehold villa currently under construction, offering nearly 240 m2 of gross floor area spread over 3 levels.
This villa benefits from the HPE label, guaranteeing environmentally friendly services, allowing virtual energy autonomy. Thanks to a choice of specific materials, its carbon footprint will be reduced.
The house is distributed as follows:
In the basement: a games room of 28.50 m2, a laundry room of 14.90 m2 including a boiler room and a room of 17 m2 served by skylights providing natural light.
On the ground floor: an entrance hall, a fully equipped kitchen open to the living/dining room of 45 m2 with large bay windows opening onto a terrace of 23 m2 and the fully fenced garden, a guest toilet with sink and a second terrace.
On the first level: 4 bedrooms including a master suite with shower room and dressing room, a master suite with private shower, and two additional bedrooms as well as a bathroom.
The house will benefit from a heating system using an air-water heat pump coupled with solar panels.
The budgets allocated for services, such as the kitchen, floor coverings and earthenware, offer a wide choice of quality materials.
Delivery scheduled for August 2025.
This villa benefits from the HPE label, guaranteeing environmentally friendly services, allowing virtual energy autonomy. Thanks to a choice of specific materials, its carbon footprint will be reduced.
The house is distributed as follows:
In the basement: a games room of 28.50 m2, a laundry room of 14.90 m2 including a boiler room and a room of 17 m2 served by skylights providing natural light.
On the ground floor: an entrance hall, a fully equipped kitchen open to the living/dining room of 45 m2 with large bay windows opening onto a terrace of 23 m2 and the fully fenced garden, a guest toilet with sink and a second terrace.
On the first level: 4 bedrooms including a master suite with shower room and dressing room, a master suite with private shower, and two additional bedrooms as well as a bathroom.
The house will benefit from a heating system using an air-water heat pump coupled with solar panels.
The budgets allocated for services, such as the kitchen, floor coverings and earthenware, offer a wide choice of quality materials.
Delivery scheduled for August 2025.