CASAN Immobilier offers you superb new and fitted out halls of 176m2 on 3 levels with ample parking and ideally located a few meters from the motorway and the CFF station.
In order to meet the different needs of companies as well as their budgetary and operational constraints, modularity and flexibility were at the heart of the architectural reflection. This project is resolutely contemporary in expression and focused on current environmental concerns.
Of wooden construction, the halls offer 3 levels thus making it possible to accommodate activities of research and development, creation, production, storage and offices.
- Ground floor: approx. 72m2 with a payload of 1000kg/m2
- Mezzanine: approx. 36m2 with a payload of 300kg/m2
- Attic: approx. 68m2 with a payload of 300kg/m2
The user can extend the mezzanine on the full floor.
Great flexibility in use can be achieved through interior walls separating the room. For example, thanks to the independent entrance door, the office / storage space can be isolated from the production / garage on the ground floor by means of an interior wall.
The construction description and the plans are available on request.
Basic equipment provided
- Heating: two split devices (on the ground floor and upstairs)
- Sanitary: WC washbasin under the stairs of the mezzanine
- Clear water: supply, stainless steel pipes (to be crimped, diameter 63 to 32) in each hall: 1 valve, 1 meter with remote reading
- Wastewater: EU pipe waiting in each hall with a diameter of 110 mm
- Rainwater: EP downpipes are made of insulated PVC. They pass through the interior of the halls. The columns are insulated against condensation and noise propagation. The entire roof is connected to the building's EP network.
- Electricity: A 25 AMP electrical distribution panel is installed in each hall. The switchboards are equipped with FI power 16A protection circuit breakers
light points and electrical outlets on each floor
- Internet / Telephone: A power supply is provided in each box.
- Parking space: The rental of a numbered parking space per hall is compulsory. Depending on the availability of the site additional parking spaces can be acquired.
Dimensions of parking spaces: 2.60 mx 5.00 m
Equipment not included (price on request available)
- Doors: sectional door automation with remote control
- Windows: supply and installation of blinds (imposed model)
- Sanitary: supply and installation of a kitchenette, shower, etc.
- Parking: possibility of creating parking spaces for electric or hybrid cars
- Miscellaneous (non-exhaustive list): interior finishes, chandeliers, flooring, etc.
Monthly rent: fr. 1'655 fr. 50 a parking space fr. 30 deposit of PPE charges = fr. 1,735 individual charges according to private equipment
Note that there remains a raw hall (without heating, sanitary, painting and electrical installations) for fr. 1'560.
In order to meet the different needs of companies as well as their budgetary and operational constraints, modularity and flexibility were at the heart of the architectural reflection. This project is resolutely contemporary in expression and focused on current environmental concerns.
Of wooden construction, the halls offer 3 levels thus making it possible to accommodate activities of research and development, creation, production, storage and offices.
- Ground floor: approx. 72m2 with a payload of 1000kg/m2
- Mezzanine: approx. 36m2 with a payload of 300kg/m2
- Attic: approx. 68m2 with a payload of 300kg/m2
The user can extend the mezzanine on the full floor.
Great flexibility in use can be achieved through interior walls separating the room. For example, thanks to the independent entrance door, the office / storage space can be isolated from the production / garage on the ground floor by means of an interior wall.
The construction description and the plans are available on request.
Basic equipment provided
- Heating: two split devices (on the ground floor and upstairs)
- Sanitary: WC washbasin under the stairs of the mezzanine
- Clear water: supply, stainless steel pipes (to be crimped, diameter 63 to 32) in each hall: 1 valve, 1 meter with remote reading
- Wastewater: EU pipe waiting in each hall with a diameter of 110 mm
- Rainwater: EP downpipes are made of insulated PVC. They pass through the interior of the halls. The columns are insulated against condensation and noise propagation. The entire roof is connected to the building's EP network.
- Electricity: A 25 AMP electrical distribution panel is installed in each hall. The switchboards are equipped with FI power 16A protection circuit breakers
light points and electrical outlets on each floor
- Internet / Telephone: A power supply is provided in each box.
- Parking space: The rental of a numbered parking space per hall is compulsory. Depending on the availability of the site additional parking spaces can be acquired.
Dimensions of parking spaces: 2.60 mx 5.00 m
Equipment not included (price on request available)
- Doors: sectional door automation with remote control
- Windows: supply and installation of blinds (imposed model)
- Sanitary: supply and installation of a kitchenette, shower, etc.
- Parking: possibility of creating parking spaces for electric or hybrid cars
- Miscellaneous (non-exhaustive list): interior finishes, chandeliers, flooring, etc.
Monthly rent: fr. 1'655 fr. 50 a parking space fr. 30 deposit of PPE charges = fr. 1,735 individual charges according to private equipment
Note that there remains a raw hall (without heating, sanitary, painting and electrical installations) for fr. 1'560.